Charmed MySQL K8s
- Canonical
- Databases
Channel | Revision | Published | Runs on |
---|---|---|---|
8.0/stable | 180 | 02 Sep 2024 | |
8.0/stable | 181 | 02 Sep 2024 | |
8.0/candidate | 180 | 26 Aug 2024 | |
8.0/candidate | 181 | 26 Aug 2024 | |
8.0/beta | 207 | 15 Nov 2024 | |
8.0/beta | 206 | 15 Nov 2024 | |
8.0/edge | 209 | 18 Nov 2024 | |
8.0/edge | 208 | 18 Nov 2024 |
juju deploy mysql-k8s --channel 8.0/candidate
Deploy Kubernetes operators easily with Juju, the Universal Operator Lifecycle Manager. Need a Kubernetes cluster? Install MicroK8s to create a full CNCF-certified Kubernetes system in under 60 seconds.
Platform:
Note: All commands are written for juju >= v.3.0
If you are using an earlier version, check the Juju 3.0 Release Notes.
Perform a minor upgrade
Example: MySQL 8.0.33 → MySQL 8.0.34
(including charm revision bump: e.g. Revision 193 → Revision 196)
This is part of the Upgrade section. Refer to the landing page for more information and an overview of the content.
We strongly recommend to NOT perform any other extraordinary operations on a Charmed MySQL K8s cluster, while upgrading. These may be (but not limited to) the following:
- Adding or removing units
- Creating or destroying new relations
- Changes in workload configuration
- Upgrading other connected/related/integrated applications simultaneously
The concurrency with other operations is not supported, and it can lead the cluster into inconsistent states.
Make sure to have a backup of your data when running any type of upgrades! See: How to create a backup
It is recommended to deploy your application in conjunction with Charmed MySQL Router K8s. This will ensure minimal service disruption, if any.
Summary of the upgrade steps
- Collect all necessary pre-upgrade information. It will be necessary for the rollback (if requested). Do not skip this step!
- Scale-up (optional). The new unit will be the first one to be updated, and it will simplify the rollback procedure a lot in case of the upgrade failure.
- Prepare the Charmed MySQL K8s application for the in-place upgrade.
- Upgrade. Once started, only one unit in a cluster will be upgraded. In case of failure, the rollback is simple: remove newly added pod (via step 2).
- Resume upgrade. If the new pod is OK after the refresh, the upgrade can be resumed for all other units in the cluster. All units in a cluster will be executed sequentially from the largest ordinal number to the lowest.
- Consider a rollback in case of disaster. Please inform and include us in your case scenario troubleshooting to trace the source of the issue and prevent it in the future. Contact us!
- Scale-back (optional). Remove no longer necessary K8s pod created in step 2 (if any).
- Post-upgrade check. Make sure all units are in a healthy state.
Step 1: Collect
This step is only valid when deploying from charmhub.
If a local charm is deployed (revision is small, e.g. 0-10), make sure the proper/current local revision of the .charm
file is available BEFORE going further. You might need it for a rollback.
The first step is to record the revision of the running application as a safety measure for a rollback action. To accomplish this, run the juju status
command and look for the deployed Charmed MySQL K8s revision in the command output, e.g:
Model Controller Cloud/Region Version SLA Timestamp
my-model mkc microk8s/localhost 2.9.44 unsupported 01:20:47Z
App Version Status Scale Charm Channel Rev Address Exposed Message
mysql-k8s 8.0.32-0ubuntu0.22.04.2 active 3 mysql-k8s 8.0/edge 88 10.152.183.102 no Primary
Unit Workload Agent Address Ports Message
mysql-k8s/0* active idle 10.1.148.184 Primary
mysql-k8s/1 active idle 10.1.148.138
mysql-k8s/2 active idle 10.1.148.143
For this example, the current revision is 88
. Store it safely to use in case of rollback!
Step 2: Scale-up (optional)
Optionally, it is recommended to scale the application up by one unit before starting the upgrade process.
The new unit will be the first one to be updated, and it will assert that the upgrade is possible. In case of failure, having the extra unit will ease a future rollback procedure without disrupting service.
juju scale-application mysql-k8s <total number of units desired>
To scale up by 1 unit,
<total number of units desired>
would be the current number of units + 1
Wait for the new unit to be ready.
Step 3: Prepare
After the application has settled, it’s necessary to run the pre-upgrade-check
action against the leader unit:
juju run mysql-k8s/leader pre-upgrade-check
The output of the action should look like:
unit-mysql-k8s-0:
UnitId: mysql-k8s/0
...
results: {}
status: completed
...
The action will configure the charm to minimize the amount of primary switchover, among other preparations for the upgrade process. After successful execution, the charm is ready to be upgraded.
Step 4: Upgrade
Use the juju refresh
command to trigger the charm upgrade process.
Example with channel selection
juju refresh mysql-k8s --channel 8.0/edge --trust
Example with specific revision selection (do not forget the OCI resource)
```shell
juju refresh mysql-k8s --revision=89 --resource mysql-image=... --trust
The upgrade will execute only on the highest ordinal unit.
For the running example mysql-k8s/2
, juju status
would look similar to the output below:
Model Controller Cloud/Region Version SLA Timestamp
my-model mkc microk8s/localhost 2.9.44 unsupported 01:20:47Z
App Version Status Scale Charm Channel Rev Address Exposed Message
mysql-k8s 8.0.32-0ubuntu0.22.04.2 waiting 3 mysql-k8s 8.0/edge 89 10.152.183.102 no waiting for units to settle down
Unit Workload Agent Address Ports Message
mysql-k8s/0* active idle 10.1.148.184 other units upgrading first...
mysql-k8s/1 active idle 10.1.148.138 other units upgrading first...
mysql-k8s/2 active idle 10.1.148.143 other units upgrading first...
mysql-k8s/3 maintenance executing 10.1.148.145 upgrading unit
Do NOT trigger rollback
procedure during the running upgrade
procedure.
It is expected to have some status changes during the process: waiting
, maintenance
, active
.
Make sure upgrade
has failed/stopped and cannot be fixed/continued before triggering rollback
!
Please be patient during huge installations. Each unit should recover shortly after the upgrade, but time can vary depending on the amount of data written to the cluster while the unit was not part of it.
Step 5: Resume
After the unit is upgraded, the charm will set the unit upgrade state as completed.
If the unit is healthy within the cluster, the next step is to resume the upgrade process by running:
juju run mysql-k8s/leader resume-upgrade
resume-upgrade
will rollout the upgrade for the following unit, always from highest ordinal number to lowest, and for each successful upgraded unit, the process will rollout the next automatically.
Model Controller Cloud/Region Version SLA Timestamp
my-model mkc microk8s/localhost 2.9.44 unsupported 01:20:47Z
App Version Status Scale Charm Channel Rev Address Exposed Message
mysql-k8s 8.0.32-0ubuntu0.22.04.2 waiting 3 mysql-k8s 8.0/edge 89 10.152.183.102 no waiting for units to settle down
Unit Workload Agent Address Ports Message
mysql-k8s/0* active idle 10.1.148.184 other units upgrading first...
mysql-k8s/1 maintenance executing 10.1.148.138 upgrading unit
mysql-k8s/2 active idle 10.1.148.143
mysql-k8s/3 active idle 10.1.148.145
Step 6: Rollback (optional)
The step must be skipped if the upgrade went well!
If there was an issue with the upgrade, even if the underlying MySQL cluster continues to work, it’s important to roll back the charm to the previous revision. That way, the update can be attempted again after a further inspection of the failure.
Step 7: Scale-back
Case the application scale was changed for the upgrade procedure, it is now safe to scale it back to the desired unit count:
juju scale-application mysql-k8s <total number of units desired>
To scale down by 1 unit,
<total number of units desired>
would be the current number of units - 1
Example:
Step 8: Check
Future improvements are planned to check the state of the pod/cluster on a low level.
For now, use juju status
to make sure the cluster state is OK.